Replacing Inverters or EV Charging Stations on Smartmaster Pro
After replacing devices, reconfigure them as during initial installation.
After replacing an inverter or EV charging station connected to Smartmaster Pro, some reconfiguration is needed.
What to Do After Replacement
- Reconfigure the Device: Follow the same steps as during the initial installation.
- Check Data Transmission: The Smartmaster should resume data transmission automatically.
Troubleshooting Tips
- If issues occur, contact support at smartmaster@nexxtlab.com.
This ensures seamless integration and continued data flow after device replacement.